# Manage saltwater disposal with precision and compliance

Track injection volumes, monitor well pressure, and automate UIC permit compliance — all from a single platform built for SWD operations.

## Injection Well Monitoring

### WH-1

#### Injection Zone

- 500 ft
- 1,000 ft
- 2,500 ft
- 5,000 ft

#### Well SWD-3 — Live Monitoring

- **Live**
- **Injection Volume:** 847 BBL today
- **Wellhead Pressure:** 1,240 PSI normal
- **Annular Pressure:** 312 PSI stable
- **Flow Rate:** 4.2 BPM optimal
- **Pressure Trend — Last 24h:** ✓ UIC Class II Compliant | All parameters within permit limits

**Next regulatory filing:** Apr 30 | Auto-generated | Ready

## KEY CHALLENGES

### What SWD facility operators struggle with every day

#### Manual injection volume tracking

Operators log injection volumes by hand across multiple wells. Errors compound daily, creating discrepancies between actual disposal and reported figures.

#### UIC permit compliance burden

Underground Injection Control permits require detailed reporting on volumes, pressures, and well integrity. Paper records make compliance a constant scramble.

#### Hauler manifest chaos

Dozens of haulers arrive daily with paper manifests. Matching inbound loads to disposal records is tedious and error-prone without digital verification.

#### Pressure and well monitoring gaps

Without real-time monitoring, operators miss pressure anomalies that could indicate well integrity issues — risking environmental incidents and regulatory action.

## HOW WE SOLVE IT

### How Livegistics transforms SWD facility operations

01

#### Automated Volume Tracking

Injection volumes are captured digitally per well, per load. No more manual logs or end-of-day reconciliation.

02

#### Digital Manifest Matching

Inbound hauler manifests are matched to disposal records automatically. Discrepancies flagged in real-time.

03

#### Pressure & Well Monitoring

Track wellhead pressures, annular pressures, and injection rates with configurable alerts and thresholds.

04

#### UIC Permit Automation

Generate permit-ready reports automatically. Track all required data points per well and filing deadline.

05

#### Hauler Check-In & Verification

Digital gate check-in verifies hauler credentials, material type, and origin before load acceptance.

06

#### Environmental Incident Tracking

Log spills, releases, and near-misses digitally. Automated notifications to compliance team and regulators.

## COMPLIANCE

### Injection well compliance, automated and audit-ready

SWD operators face some of the strictest regulatory oversight in oil & gas. Livegistics automates every aspect of injection well compliance.

#### UIC

### UIC Class II Well Permits

Track injection volumes, pressures, and mechanical integrity test results per well. Auto-generate permit renewal documentation.

#### EPA

### EPA Underground Injection Control

Maintain federal compliance with automated volume reporting, well monitoring logs, and annual review documentation.

#### RRC

### State Oil & Gas Commissions

Meet state-specific requirements for disposal well operations including H-10 reports, monthly volume filings, and well status reporting.

## Testimonial

> "We operate 8 SWD wells across the Delaware Basin. Before Livegistics, our monthly UIC filings took a week to compile. Now they’re generated automatically — and we haven’t missed a deadline in two years."  
Carlos Medina  
VP of Operations, Delaware Basin SWD Services

- **8** SWD wells managed  
- **100%** filing compliance  
- **5 days** saved per month

## See how Livegistics works for SWD operations

Book a demo tailored to saltwater disposal operations and see injection well compliance automated end-to-end.
