Manage saltwater disposal with precision and compliance
Track injection volumes, monitor well pressure, and automate UIC permit compliance — all from a single platform built for SWD operations.
Injection Well Monitoring
WH-1
Injection Zone
- 500 ft
- 1,000 ft
- 2,500 ft
- 5,000 ft
Well SWD-3 — Live Monitoring
- Live
- Injection Volume: 847 BBL today
- Wellhead Pressure: 1,240 PSI normal
- Annular Pressure: 312 PSI stable
- Flow Rate: 4.2 BPM optimal
- Pressure Trend — Last 24h: ✓ UIC Class II Compliant | All parameters within permit limits
Next regulatory filing: Apr 30 | Auto-generated | Ready
KEY CHALLENGES
What SWD facility operators struggle with every day
Manual injection volume tracking
Operators log injection volumes by hand across multiple wells. Errors compound daily, creating discrepancies between actual disposal and reported figures.
UIC permit compliance burden
Underground Injection Control permits require detailed reporting on volumes, pressures, and well integrity. Paper records make compliance a constant scramble.
Hauler manifest chaos
Dozens of haulers arrive daily with paper manifests. Matching inbound loads to disposal records is tedious and error-prone without digital verification.
Pressure and well monitoring gaps
Without real-time monitoring, operators miss pressure anomalies that could indicate well integrity issues — risking environmental incidents and regulatory action.
HOW WE SOLVE IT
How Livegistics transforms SWD facility operations
01
Automated Volume Tracking
Injection volumes are captured digitally per well, per load. No more manual logs or end-of-day reconciliation.
02
Digital Manifest Matching
Inbound hauler manifests are matched to disposal records automatically. Discrepancies flagged in real-time.
03
Pressure & Well Monitoring
Track wellhead pressures, annular pressures, and injection rates with configurable alerts and thresholds.
04
UIC Permit Automation
Generate permit-ready reports automatically. Track all required data points per well and filing deadline.
05
Hauler Check-In & Verification
Digital gate check-in verifies hauler credentials, material type, and origin before load acceptance.
06
Environmental Incident Tracking
Log spills, releases, and near-misses digitally. Automated notifications to compliance team and regulators.
COMPLIANCE
Injection well compliance, automated and audit-ready
SWD operators face some of the strictest regulatory oversight in oil & gas. Livegistics automates every aspect of injection well compliance.
UIC
UIC Class II Well Permits
Track injection volumes, pressures, and mechanical integrity test results per well. Auto-generate permit renewal documentation.
EPA
EPA Underground Injection Control
Maintain federal compliance with automated volume reporting, well monitoring logs, and annual review documentation.
RRC
State Oil & Gas Commissions
Meet state-specific requirements for disposal well operations including H-10 reports, monthly volume filings, and well status reporting.
Testimonial
"We operate 8 SWD wells across the Delaware Basin. Before Livegistics, our monthly UIC filings took a week to compile. Now they’re generated automatically — and we haven’t missed a deadline in two years."
Carlos Medina
VP of Operations, Delaware Basin SWD Services
- 8 SWD wells managed
- 100% filing compliance
- 5 days saved per month
See how Livegistics works for SWD operations
Book a demo tailored to saltwater disposal operations and see injection well compliance automated end-to-end.